Od 25mm Stainless Steel Welded Pipes Ss 304, 201 Thin Wall Stainless Steel Round Tube

Still deciding? Get samples of $ !
Request Sample

Product Description

📋

Basic Specifications

Model NO.OD 2mm-800mm
TypeSeamless / Welded
TechniqueCold Drawn / Cold Rolled / Hot Rolled
MaterialStainless Steel (200, 300, 400 Series)
Surface TreatmentBA, 2B, No.1, No.4, No.5, Hair Line, Mirror Finish
Outer Diameter6mm - 1016mm (1/8''-40'')
Wall Thickness0.5mm - 65mm (Sch5s-XXS)
Length3m - 12m or customized
StandardJIS, SUS, GB, DIN, ASTM, AISI, EN
Production Capacity1,000,000 Tons/Year
Stainless Steel Tubes Showcase
🔍

Product Details & Materials

Category Range / Material Grades
AusteniticTP304, TP304L, TP304H, TP309S, TP310S, TP316L, TP316TI, TP317L, TP321, TP347H
Duplex SteelUNS S31803, UNS S2205, UNS S32750, UNS S32760
Nickel Alloy800/800H/800HT, MONEL400, K-500, HASTELLOY C-22, C-276, B-2, B-3
400 Series430, 420, 410, 441, 444, 439, T4003
200 Series201, 202, QN1803, QN1804
📦

Packing & Delivery

Packing 1
Packing 2
Packing 3
Delivery 1
Delivery 2
🏭

Applications & Usage

Our stainless steel tubes are widely used in pipeline transport, boiler systems, hydraulic/automobile piping, oil/gas drilling, food and beverage processing, chemical industry, and architectural decoration.

Usage 1
Usage 2
Usage 3
Usage 4
📊

Surface Finish & Technical Charts

Surface Finish 1
Surface Finish 2
Surface Reference Chemical Elements Chart Technical Specifications DN Conversion Chart Brand Partners

Frequently Asked Questions

What product information do I need to provide for an inquiry?
You need to provide the specific steel grade, width, thickness, surface coating requirements, and the total quantity (tons) you wish to purchase.
How long is the typical delivery time?
For stock products, delivery takes 3-7 days after payment. For customized orders, the typical lead time is 20-45 days.
Can I request samples for quality testing?
Yes, samples are available. The cost depends on the product value, and freight charges are usually covered by the customer.
How do you ensure product quality before shipping?
All products undergo a three-stage inspection process: during production, random testing in the warehouse, and a final check before shipping. Third-party inspections are also welcome.
What payment methods do you accept?
We primarily support T/T (Telegraphic Transfer) and L/C (Letter of Credit) at sight.
How can I get the best price for my project?
Pricing varies based on steel grade, size, and volume. Please provide your detailed specifications or drawings for fabrication, and we will offer the most competitive solution.

Related Products