Premium Molybdenum Alloy Seamless Steel Tube for Boilers Precision Ground Seamless Steel Tube - DIN1630 St37.4, En10305-3 St37.4 for Linear Motion Systems

Still deciding? Get samples of $ !
Request Sample

Product Description

📋 Basic Information
Model NO.
L80, C90, ASTM A106 Gr. B, P11, P22, UNS N06625
Technique
Hot/Cold Rolled, Cold Draw, ERW, Saw, Efw, Extrude
Material
Carbon, Stainless, Alloy
Surface Treatment
Black/Varnishing/Polished/Oiled/Galvanized
Section Shape
Round
Certificate
CCS, ABS, ISO9001
Delivery
at Stock or 7-15 Days
Quality Control
100% Inspection
⚙️ Product Description
Seamless Steel Tube

Seamless Steel Tubes/Pipes for High Pressure Fertilizer Equipment is a high-quality carbon structural steel and alloy steel seamless steel pipe suitable for chemical equipment and pipelines with working temperature of -40 to 400 degrees Celsius and working pressure of 10 to 30MPa.

Use: Suitable for transporting chemical media such as synthetic ammonia, urea and methanol.

Dimensional Tolerances

Pipe Types Outer Diameter (mm) Permissible Deviation Wall Thickness (mm) Permissible Deviation
Cold Drawn Pipe 30 ~ 50 ±0.3 ≤30 ±10%
Hot Rolled Pipe >219 ±1.0% >20 ±10%
📸 Detailed Photos
Detail 1
Detail 2
Detail 3
Detail 4
Detail 5
Detail 6
📦 Packaging & Shipping

1. Export sea worthy package + water proof paper

2. Safe loading and fixing Professional teams

Delivery Detail: within 7-10 working days after receiving deposit.

Packaging
⭐ Our Advantages
Exceptional Service: Response within 12 hours.
Certifications: ISO 9001, CE, and SGS certifications.
Production: Monthly output of 20,000 tons.
Quality: Factory-direct competitive pricing.
Production Advantage
❓ Frequently Asked Questions
Q1: What are your primary product offerings?
A1: We specialize in Stainless Steel & Carbon Steel (sheets, coils, pipes), various structural bar profiles, and custom fabrications tailored to project requirements.
Q2: What quality assurance measures do you have in place?
A2: We provide Mill Test Certificates with all shipments, offer optional third-party inspections (SGS, BV), and follow ISO-certified manufacturing processes.
Q3: What is your typical delivery timeline?
A3: Stock items are ready within 3 business days. Made-to-order items typically take 7-15 working days post-deposit.
Q4: Do you provide product samples?
A4: Yes, we offer complimentary small samples from existing inventory; customers are only responsible for shipping costs.
Q5: What are your payment terms?
A5: Standard terms are 30% advance payment via T/T to initiate production, and the remaining 70% balance due prior to shipment.
Q6: Why should we choose your steel products?
A6: We offer factory-direct pricing, rigorous quality testing, reliable on-time delivery, and expert technical support at every stage of your project.

Related Products