Basic Information
Model NO.
A333 Gr. 6, A333 Gr. 3, A333 Gr. 1
Technique
Hot/Cold Rolled, Cold Draw, ERW, SAW, EFW, Extrude
Material
Carbon, Stainless, Alloy
Surface Treatment
Black/Varnishing/Polished/Oiled/Galvanized
Certificate
CCS, ABS, ISO9001
Production Capacity
200,000 Ton/Year
Product Description
Seamless steel pipe for low temperature is suitable for pipeline engineering in low temperature environments. Specially engineered for cryogenic applications, these pipes maintain exceptional toughness and structural integrity in extreme cold environments down to -196°C (-320°F). The production process mainly involves cold drawing and hot rolling.
These pipes undergo subzero Charpy testing and cryogenic hydrostatic tests to guarantee performance under thermal contraction stresses. Emerging 9% Ni steel pipes now enable even more economical LNG solutions.
Standard: GB/T 18984 (Chinese National Standard), ASTM A333 (American Society for Testing and Materials)
Main Grades: 16MnDG, 10MnDG, 09Mn2VDG, A333 Gr.6, A333 Gr.3, A333 Gr.1
| Standard |
Grade |
Tensile Strength (MPa) |
Yield Strength (MPa) |
Elongation (%) |
| GB/T 18984 | 16MnDG | 490~665 | ≥315 | ≥30 |
| GB/T 18984 | 10MnDG | ≥400 | ≥240 | ≥35 |
| ASTM A333 | A333 Gr.6 | ≥415 | ≥240 | ≥30 |
| ASTM A333 | A333 Gr.3 | ≥450 | ≥240 | ≥30 |
Detailed Photos
Packaging & Shipping
✓ Export sea worthy package + water proof paper
✓ Safe loading and fixing by professional teams
Delivery Detail: Within 7-10 working days after deposit or according to quantity.
Our Advantages
★ 12-Hour Inquiry Response
★ ISO 9001, CE, SGS Certified
★ Factory-Direct Competitive Pricing
★ 20,000 Tons Monthly Output
★ Flexible T/T & L/C Payment
★ Customization Dedicated
Frequently Asked Questions
Q1: What are your primary product offerings?
A1: We specialize in high-quality steel products including Stainless & Carbon Steel sheets, coils, pipes (seamless/welded), and various structural bar profiles and custom fabrications.
Q2: What quality assurance measures do you have?
A2: We provide Mill Test Certificates with all shipments, offer optional third-party inspections (SGS, BV), and follow ISO-certified manufacturing processes.
Q3: What is the typical delivery timeline?
A3: Stock items are ready within 3 business days. Made-to-order items typically take 7-15 working days following deposit confirmation.
Q4: Do you provide product samples?
A4: Yes, complimentary small samples from inventory are available. Customers are only responsible for the shipping costs.
Q5: What are your payment terms?
A5: Standard terms are 30% advance payment via T/T to initiate production, with the remaining 70% balance due prior to shipment.
Q6: Why should we choose your products?
A6: We offer rigorous quality assurance, factory-direct pricing, on-time delivery fulfillment, and expert technical support at every stage.